Never do extra work on a verbal yes — get SMS sign-off in 30 seconds

The gate moved, the client wants more gravel, you hit rock. Add the line item and price on your phone, text the signing link from your own number, and keep working once it is signed. $19–$29/mo for up to 3 crew.

Before-photos & damage pins

Existing conditions to disclose

Clause

The add-on or scope-change items listed below are outside the original quote. The crew starts them only after this signed approval, at the prices shown. Anything not listed is not included.

Clause

Buried rock, roots, old footings, irrigation lines or utilities found while digging can change the scope and price. The contractor will request utility locates before digging and will stop and get a new sign-off before any extra work.

Clause

Added work can extend the schedule. If a material is unavailable, the contractor will offer an equal substitute or a revised price for approval before using it.

Clause

The client is responsible for confirming property lines, HOA approval and any permit the work requires, unless the contractor has agreed in writing to handle it.

Clause

Weathered or unsealed wood (decks, fences, pergolas) can lighten, change color unevenly or raise its grain ("furring") after cleaning. Sanding, brightening and sealing are not included unless listed as an add-on.

Clause

The crew will pre-wet and rinse plants, grass edges and mulch before and after applying cleaning solutions (which may contain sodium hypochlorite). Even with this care, sensitive or stressed plants can show leaf spotting or browning. The client has pointed out any prized or sensitive plants, koi ponds and vegetable beds before work starts.

Optional add-ons

Custom condition or job notes (optional)

Send your signing link

3 live SMS sign-offs free, no card. Enter your email for a one-tap sign-in link; your draft stays saved here.

Send signing link

Preparing link…

From this phone

Opens Messages with the link pre-filled ($0.00/SMS).

Open Messages

Scan from laptop

Point your phone camera here to send from your cell.

Hand to homeowner

Client scans on the spot and signs in browser.

Copy message

Send by email

Link:

Rates

Free PDF & Starter$0Unlimited PDFs + 3 live SMS sign-offs
Solo Operator$19/mo1 user, unlimited SMS ($0.00/SMS)
Crew Plan$29/mo / $229/yrUp to 3 crew, shared log & logo

14-day no-questions-asked refund: email us within 14 days of any charge for a full refund. Full plan comparison.

Common questions

How do SMS change orders work without a texting service?

WashWaiver opens your phone’s own Messages app with the client’s number and a no-login signing link already filled in. You tap Send, so it comes from your real number at no per-text cost.

How many crew members can use it?

The Crew Plan includes up to 3 team members (1 owner + 2 crew techs) for $29/mo or $229/yr.

What does the client get after signing?

Both of you receive the signed PDF with a SHA-256 tamper-evident audit certificate by email, and the client can download it right away.